PLANNING AND EXECUTION CONTROL FOR COMPLEX PROJECTS

Project Planning.
Production Management.
Execution Control.

Jenasaro is construction planning and production management software for planners, construction managers and trade teams on infrastructure, rail, buildings, industrial plants and energy projects. Connect schedule logic, work readiness, daily commitments, resources and model-linked progress, from civil works to MEP, in one environment.

One connected production-control environment — from schedule structure to field execution.

Schedule + logicWork readinessDaily commitmentsManagement KPIs
01
PROJECT PLANNINGStructure the plan
02
PRODUCTION MANAGEMENTMake work executable
03
EXECUTION CONTROLControl actual delivery
04
MANAGEMENT VISIBILITYSee variance early

Built for complex projects of every kind

FROM PROJECT INTENT TO DAILY EXECUTION

Schedules define intent. Delivery depends on execution.

Traditional scheduling tools are essential for scope, logic and milestones. The execution gap appears when the field team must translate that programme into ready work, daily commitments and coordinated hand-offs.

1PLANWhat should happen?
→
2READYCan it start?
→
3COMMITWho will do it?
→
4EXECUTEWhat did finish?
→
5LEARNWhy did it vary?

Jenasaro keeps the master schedule and field-control cycle connected, so a project can see not only what should happen, but what is ready, what has been promised, what actually happened and why it varied.

Try it

Move today forward and watch the plan answer back.

A small demo project with made-up data. Slide the Today line, clear the constraint and tick the milestone complete. Ready work, delays and the forecast update as they do in Jenasaro.

The interactive demo needs JavaScript. The schedule at the top of the page shows the same view.

Feature tour

Every view of the job, from master plan to site.

Planners, site managers, team leads and management work from the same live data, whether the job is a rail line, a bridge, a building or a plant. Here is what each of them opens in the morning.

Import an existing programme or build the plan directly. Finish-to-start, start-to-start and lags work as they should. The baseline stays visible under the forecast, constraints show as a stop sign on the bar, and every task carries its own ahead or delay counter, kept as a record once the work is complete.

  • Primavera P6 (XER) import
  • Baseline lock & mitigation
  • Delay counters for claims
  • Blank placeholder rows
  • Live link preview

PEOPLE, RESPONSIBILITY AND TRAINING

Keep the project structure connected to delivery.

Explore the people behind the plan and help your team learn the workflows they use.

1 | PROJECT PLANNING

Build a schedule that is structured for execution.

Start with the project plan — imported from Primavera P6 or developed directly — and add the location, ownership and resource structure required for production management.

Schedule and logic

  • P6/XER import and schedule structure
  • Gantt and network views
  • FS, SS, FF and SF relationships with lead/lag
  • Baseline and current bars
  • Milestones and backward planning

Structure for delivery

  • Up to five location/area levels
  • Subcontractor and team assignment
  • Client-side area owner assignment
  • Work calendars and team capacity
  • Process libraries and repeatable flows
SCHEDULE CONTROLBaseline · Current · Today
ActivityBaselineCurrent
Electrical room release
Cable containment
Equipment installation+4d
Testing & handover

2 | PRODUCTION MANAGEMENT

Turn the programme into executable work.

Production management is the operating layer between the master schedule and the site. It asks a practical question: what work can each team reliably execute next, in which location, with which prerequisites already resolved?

LOOK AHEADIdentify upcoming workActivities, locations and prerequisites
READYRemove constraintsRelease workfronts before crews arrive
COMMITAssign teamsDaily and weekly commitments
COMPLETECapture actualsClose work and update the next plan
01

Daily production plan

Commit available work, close the day, review next-day work and reopen or uncommit with planner rights.

02

Teams and capacity

Define subcontractor teams, crew size, production rate and work week. See where resources are already committed.

03

Visual workfront control

Use drawings, process maps and location boards to show work zones, sequence, task dates and hand-offs.

3 | EXECUTION CONTROL

See variance while there is still time to act.

Execution control compares planned intent with actual delivery. Jenasaro keeps the baseline visible, moves the current plan with real field status and makes constraints and reasons for variance part of the same operating picture.

BASELINE VS CURRENTKeep original intent visible

Current bars reflect actual starts, completions and live position while the baseline remains fixed for comparison.

CONSTRAINTSEscalate before commitment

Record category, owner, due date and status so blockers are visible before they reach the committed work window.

VARIANCE LEARNINGUnderstand why work moved

Capture reasons for non-completion and use recurring causes to improve the next planning cycle.

PLAN RELIABILITYMeasure promises, not activity volume

Track PPC alongside cycle time, constraint status, planned-vs-actual dates and milestone movement.

METHODS & INTEGRATIONS

Proven production-control methods — explained in plain project language.

Jenasaro supports established Lean Construction and production-planning practices, but the product is positioned around the operational outcome: reliable planning and controlled execution.

PULL

Pull planning

Plan backwards from the required milestone and make hand-offs visible.

READY

Make-ready

Remove prerequisites before work is promised to the field.

PPC

Plan reliability

Measure how reliably commitments were completed and learn from variance.

P6

Primavera P6

Keep the planning stack and bring programme information into the execution layer.

VISUAL

Visual management

Use drawings, process maps and location boards to connect work with the physical workfront.

EXPLORE THE SOFTWARE

Find the workflow your project needs.

Explore the capabilities, practical examples and questions that matter when choosing construction planning software.

DEPLOYMENT

Keep the planning stack. Strengthen the execution layer.

Jenasaro is designed to work alongside the project planning environment rather than forcing a rip-and-replace. Start with one project or phase, configure the production-control model and scale from measured results.

01

Project deployment

Configure a live project, import schedules, structure areas and teams, train users and establish production-control routines.

02

Managed production control

Jenasaro plus facilitation support for look-ahead planning, work readiness, commitments, variance review and reporting.

03

Enterprise rollout

Standardise templates, governance, reporting and training across multiple projects or business units.

04

Training + advisory

Production planning, Last Planner, PPC, takt/location planning and visual management with or without a full software rollout.

FROM SCHEDULE TO CONTROLLED DAILY EXECUTION

Make planning visible. Make promises measurable. Make delivery more reliable.

See how Jenasaro could connect your existing master programme with work readiness, team commitments, constraints, execution status and management analytics.

Request a demo