PRIMAVERA P6 · PRODUCTION PLANNING

Bring Primavera P6 schedules closer to production control.

Jenasaro provides an import path for Primavera P6 programme data so project teams can use existing schedule information as the starting point for make-ready planning, production commitments, constraints and field execution.

Keep P6 as programme context while adding a production layer

Primavera P6 is widely used for programme scheduling, logic and milestone control. Daily construction production, however, usually requires additional information about areas, workfront readiness, constraints, teams and short-cycle commitments. Jenasaro is designed to bridge that gap.

Imported programme information can be organised into the Jenasaro project structure and then used as context for production planning rather than requiring planners to rebuild every activity manually.

What the production layer adds

Make-ready planning

Identify blockers before scheduled activities are expected to start.

Daily commitments

Turn programme activities into executable work that field teams can commit and complete.

Team and area context

Connect schedule activities to subcontractors, crews, owners and physical project locations.

Performance feedback

Use PPC, reasons, constraint trends and milestone movement to improve control.

Avoid separate versions of the plan

The practical objective is a traceable connection between higher-level schedule intent and the production decisions made closer to execution. That gives planners and delivery teams a shared reference while still allowing each discipline to work at the level of detail it needs.

Related production-control topics

What the P6 import supports

The current workflow accepts Primavera P6 XER exports. Review the activity dates, work breakdown structure and dependency relationships in the import preview before confirming. The import brings programme information into Jenasaro; it is not a live two-way synchronisation with P6.

Imported current dates become the initial Jenasaro baseline; saved P6 baselines are not contained in the XER import. Dates use the target project’s working week rather than reproducing every P6 calendar shift or holiday. P6 resource and cost assignments are not applied, and P6 XML is not supported. Check these requirements during a demonstration using a representative export.

See how Jenasaro could fit your project.

Tell us about your planning environment, current tools and production-control workflow. We can focus a demonstration on the parts of the process that matter to your team.